• SEARCH
  • HOTELS
 

In order to cope with the increasing number of passengers and meet the highest security standards, Poznań-Ławica Airport has been realizing a long-term investment plan.

 

The plan specifies that in the near future, the following investments will be realized:

 

2007 | Redevelopment of apron area narrowing and

building vertical signage of the airport – adaptation to the requirements of ULC (check offer)

 

2007 | Redevelopment of apron area – change in organization of ground traffic of airplanes

 

2007 | Building of luminous vertical signage of airport

 

2007 | Development and adaptation of the passenger terminal to meet the requirements of the Schengen Agreement

 

2007 | Building of a new car park for passengers together with communication system

 

2008 | Building of a station for ice removal

 

2008 | Expansion of technical roads

 

 

Timetable
On-line
ARRIVALS DEPARTURES
TIME DEST. FLIGHT NO. STATUS
18:45 Munich LO371/LO371 CHECK-IN OPEN
18:45 Munich LH2237/LO371 CHECK-IN OPEN
20:10 Edinburgh FR6619 CHECK-IN OPEN
20:20 Cracow O2414
20:45 Hurghada TAS8010
21:10 London-Stansted FR2337
00:00 BAG DROP FRFR
05:40 Warsaw LO3942
06:10 London-Luton W6501
07:00 Munich LO369/LO369
07:00 Munich LH2271/LO369
07:00 Munich AC6790/LO369
07:35 Frankfurt LO401/LO401
07:35 Frankfurt LH2281/LO401
09:00 Warsaw LO3958
last updated: 18:24, 12.03.2010